views
KOCHI: Former chairman of Delhi Metro Rail Corporation (DMRC) E Sreedharan will visit Moolampilly-Chathanad area for looking into the proposal for constructing three bridges on Moolampilly Chathanad four-lane road. E Sreedharan has informed that he would visit the place on April 19, said District Collector P I Sheik Pareeth.The project for a four-lane road connecting the islands of Moolampilly, Pizhala, Valiya Kadamakkudi and Chathand was approved at a meeting of the Goshree Islands Development Authority (GIDA) in January.The GIDA had requested the DMRC to take over the construction of the bridges. Following this, a high-level team of DMRC visited the proposed site last month.The Moolampilly-Pizhala bridge (180 metres), Pizhala- Valiya Kadamakkudi (230 metres) and Valiya Kadamakkudi-Chathanad bridge(350 metres) are the three major bridges to be constructed on the 4.5 km-long and 22-m wide Moolampilly-Chathanad four-lane road.The estimated total cost of the project is Rs 97.2 crore.Once completed, the road will open a new connectivity between Chathanad and Vallarpadom Container Terminal Road.The residents of Kadamakkudi panchayat will be the main beneficiaries of the project as they can travel to Ernakulam via Container Road.
Comments
0 comment